Current Status

We have initiated our Phase 2 expansion by acquiring additional 2 acres of land adjacent to the existing plot.

We have performed Bhoomi Pooja and started the construction on 9th October 2021.
Expected to complete the construction to initiate the qualification by July 2023.

 

In this facility we will have the following capabilities

 
  • Ampoules / Vials (Combo Line) with inline Lyophilizer, can handle from 1mL to 25 mL in Vials, 1 mL to 15mL in Ampoules – 11 Mn Units pa
  • Ophthalmic drops in 3 Piece Container, can handle clear liquid and suspensions in 5mL to 15 mL – 7.2 Mn
  • Prefilled Syringes / Cartridges, 0.5 mL – 5mL in nested tub – 3.6 Mn
  • Minimum Batch size 30 Ltrs and Maximum Batch size 300 Ltrs
  •  

Facility will be in compliance with USFDA / EU/ AU and other regulatory guidelines.

Bhoomi Pooja completed

Expansion of Phase 2 Manufacturing for Small Volume Parenteral“Axxelent R&D unit received Recognition letter & Registration Certificate from DSIR, Ministry of Science and Technology, Govt. of India”